Skip to main content

777 slot machine

Overview

Clancy & Theys Construction Company recently completed an interior fit-up for the Poyner Family YMCA in downtown Raleigh. The new facility includes street level access and 2 basement/concourse levels 5 dragons slotof existing 10 story building constructed in 1965 in the heart of downtown Raleigh. The basement/concourse level 1 (visible from plaza curtainwall glass) fit-up space has been home to banks over the years including walk-in vaults. The projects includes a cafe, state-of-the-art locker room and saunas, administrative areas, workout/fitness studios, wellness areas, sprinting track, and more. The scope includes the selective 777 slot machinedemolition of approximately 32,000 SF of existing street level and two basement levels to facilitate the fit-up of the new storefront facility. Clancy & Theys also constructed a new mezzanine from the existing street level mezzanine space for use a conference room with interior glass storefront walls overlooking the level 1 concourse/basement fitness area.

Project Details
Location: Raleigh, North Carolina
Architect: RATIO
Size: 32,100 SF
Slots game onlineKey Engineers:
Share this project:

free slot games

July 25, 2024
Read Now