Skip to main content

2024 European Cup official website

Overview

Clancy & Theys Construction Company provided a CM at-risk for the completion of this project.  Two buildings totaling 58,2024 European Cup official betting app845 sq ft.  The first, a Crisis Assessment Unit (CAU), is a 39,775 sq ft, two-story facility containing entry/admissions area for assessment, referral consultation and medically supervised observation on the first floor, and a 16-bed facility based crisis unit and a 16-bed secure detoxification unit sharing the second floor.  The second building, a Substance Abuse Treatment Facility (SAU), is a 19,2024 European Cup Qualifying Football Predictions070 sq ft, two-story, 16-bed voluntary inpatient treatment facility.  The exterior of both buildings is brick veneer, ashlar stone veneer, and metal wall panels.  Aluminum and storefront entrances and windows and entrance canopies framed in steel with translucent roofing add to the aesthetic quality of the design.

Project Details
Location: Raleigh, North Carolina
Size: 58,845 sq ft
Share this project: